Monday, 20th of November 2017

Projects

Aug. 2009 - Metro Markt Istanbul

In the year 2009 the first and up to now only solar thermal system for adsorptive cooling in Turkey with a collector area of 1.030 m² was putted into operation. High performance vacuum tube collectors of Paradigma company achieve an annual solar yield of 770 MWh, which is used for heating in winter and for the climatisation of the building in summer.

read more >>


Oct. 2008 - Office building Konstanz

At approximately 10,000 square meters of rental space in Bodan Street, directly on the beautiful shores of Lake Constance, an office building was built which makes a shopping heart beat faster. In this project LEW Automotive was in charge for the ventilation unit. 5 HVAC systems and a many small scale units supply the office building with approximately 130,000 m³/h conditioned air.

read more >>


June 2008 - Gas measuring test tracks Dungs

Dungs ranks among the world leaders in the production of components and systems for gas safety and control systems. For the production site in Urbach the company decided to improve its already high quality standard by the construction of a new gas measuring test track. The necessary compressed air has to comply with accurate state conditions for various tests of their gas control devices.

read more >>



Sep. 2007 - Collector system Esslingen

The biggest tube collector installation of the world with a gross collector area of 1.330 m² was putted into operation at the end of the year 2007 in Esslingen near Stuttgart, Baden-Württemberg. This installation both supports an adsorption refrigeration machine for the cooling of 27.000 m² of office space and contributes to the heating in winter.

read more >>